Wednesday, February 25, 2026

F-20: Inconsiderate Engineer

 Statement of the Case: Engineer A was a consultant in a specialty of process control. He had a
small consulting firm, employing one computer technician and a shared secretary. The specialty was well paid, and Engineer A had no local competitors. A large utility company hired Engineer A to design a key part of a major gas distribution facility. Engineer B, an employee of the gas utility, was resident engineer for the project, responsible for the site installation. The project involved several specialties, but since the system was complex, changes frequently affected everyone, so close communication and co-operation were essential.

During the project, the utility company decided to revise the specifications, and many field
changes had to be made to Engineer A’s design in order to accommodate the changes. Engineer A’s time was paid as an “extra.” Nevertheless, Engineer B could rarely communicate with  Engineer A, and it was almost impossible to get a quick response. Although Engineer B was skilled in process control, Engineer B could not, of course, change Engineer A’s design without contacting him and receiving approval. Eventually, Engineer B prepared a communications log of key calls and meetings with Engineer A, which read as follows:

(1) The first time B needed to contact A, he was unsuccessful. Engineer A was absent on
vacation, but had not left his staff with a phone number.
 (2) The next contact was successful, and A replied with a fax containing details of the needed
change. However, the change later proved to be in error. Engineer A sent a second fax with
correct data, the following day.
 (3) The next contact was successful.
 (4) & (5) The next contact required an early afternoon meeting at A’s office. Engineer A
arrived 45 minutes late, provided no explanation, but clearly had consumed alcohol. Engineer
B made an appointment for the next day and this meeting took place in a satisfactory manner.
 (6) & (7) The next two contacts were successful.
 (8) & (9) The next contact, by telephone, was satisfactory, and Engineer A promised to fax a drawing to B that day. The fax had not arrived by 4 pm, so B phoned A, but was told by the
secretary that A had already left, and neither the secretary nor the technician were aware of
the promised drawing. Engineer B phoned A the next day and A apologized profusely, saying
the drawing was ready, but he had simply forgotten to fax it. Engineer A sent the drawing by
fax, several hours later.

When the facility was completed, a dedication ceremony was held, attended by workers,
politicians, and local residents. Engineer B invited A to attend, to sit on the platform and to be
introduced to the audience, but he was not required to speak. Engineer A agreed to be there, but did not show up. When contacted later, A said he had an urgent meeting with another client and forgot to phone to explain the change of plan.
Shortly after the completion of the project, Engineer A bid on a similar design contract, but did not receive it. When he contacted Engineer B to discuss the loss of the contract, he was informed that his lack of attention to the previous contract swayed the decision against him.

Question: Was Engineer A negligent in his communication with Engineer B? Was it appropriate for Engineer B to consider the poor communication as a factor in awarding the subsequent contract?

Authors’ Comments: Although Engineer A’s actions show a pattern of discourtesy, they would
not qualify as negligence under the definition of the Act. Some of these communication
problems might be excusable lapses of behaviour, even though, taken together, they indicate a
discourteous attitude toward a client and colleague, contrary to the Code of Ethics. Although
such conduct may not justify a complaint to the Association, the discourtesy is a reasonable basis for awarding future contracts to a more communicative and co-operative colleague.

7 comments:

  1. Q.Was Engineer A negligent?
    ✅ Correct Answer
    Not misconduct, but unprofessional (poor communication)

    ReplyDelete
  2. why not option (B)
    Q.Engineer repeatedly unavailable.
    A. Misconduct
    B. Negligence
    C. Unprofessional conduct
    D. Acceptable
    ✅ Answer: C

    ReplyDelete
    Replies
    1. Why NOT B (Negligence)?

      This is the key distinction.

      ๐Ÿ”น What is negligence?

      Negligence means:

      Failure to meet the standard of care, resulting in harm, damage, or unsafe outcomes

      It usually involves:

      Design errors causing failure
      Safety risks
      Financial or physical damage
      ๐Ÿ”น What happened in this case?

      Engineer A:

      Was repeatedly unavailable
      Delayed communication
      Forgot commitments
      Behaved unprofessionally

      BUT:

      No evidence of harm, failure, or unsafe design outcome
      Errors (like fax mistake) were corrected
      No demonstrated damage → NOT negligence

      Delete
  3. Exam insight (NPPE trap)

    If an option suggests:

    “He eventually did the work”
    “He was technically correct”
    “He was just busy”

    ๐Ÿ‘‰ These are common distractors

    Correct thinking:

    Timeliness + professionalism + communication = required

    ReplyDelete
    Replies
    1. Technical ability does NOT excuse poor professional conduct

      Delete
  4. Exam shortcut

    If you see:

    Poor communication
    Delays
    Rude or careless behavior
    No actual damage

    ๐Ÿ‘‰ Answer = Unprofessional conduct

    ReplyDelete
    Replies
    1. If you see:

      Safety risk
      Financial loss
      Design failure

      ๐Ÿ‘‰ Then think = Negligence